Kinnegar WWTW Optimisation

LaganMEICA has operated Kinnegar for over 21 years, this includes payment for Operations, Maintenance, Power, Chemicals and Mid Life maintenance. We embarked on an optimisation programme in 2016. Our 2020 power usage has been reduced by 30% compared to 2015 and previous years and is on course to achieve a further reduction in 2021. This has been achieved by smart investment and innovative use of the plant through process and plant optimisation.

Where Are we Now

  • Process optimisation and control for NIW sites
  • Energy /chemical savings
  • Hydrogen /Oxygen economies
  • Demand Response Services (DS3)
Further trials at the innovation hub at Kinnegar
  • Process Control
  • Integrated Control Centre –NOWCasting + real time control
  • Electrolyser/H2 & O2 storage
  • District heating/cooling- Heat Sink, Renewables Solar PV, Algae.
  • Potential green house area on Old Army base heated by heat source units at Kinnegar
  • Hydrogen Natural Gas Energy feasibility study
  • Sludge to Energy (by products)
  • Alps BioCatalyst solutions
  • Hydrodynamic Vortex Separators
  • Turbine & Hydro energy
  • Willow Plantation/Greenhouses